|
<< Click to Display Table of Contents >> Navigation: Main modules > Log / Purchase > 5.7.9: PO/R - Repair Order |
How to launch a repair order? |
|
|---|---|
1 |
From the
or
From the
|
2 |
The PO/R sub-module is highlighted to show that it is holding changes waiting to be validated. Click on it.
Important: You can repeat the same procedure from step 1 with other row items to be added to the same PO/R |
3 |
Review the preset fields value and enter the missing data (Material code, condition, ..), then validate
|
4 |
At this stage, the PO/R is raised and you can already print this PO/R using the same method as any other document type ( Print a document)
Optional: To manage the repair process (including the repair assessment, acceptance/rejection of repair procedure and charges) double click on a row item of your PO/R to display the repair details:
|
|